Featured Project
BMS
1-Building Management System (BMS)
- BMS system to Full control of HVAC systems including AHU, FCU, VAV, Chillers, Boilers, Pumps, Valves, and Dampers. With Advanced PID control of temperature, & humidity and pressure for precise operation BMS system
BMS Work Scope (Building Management System)
1. System Design & Engineering
- Review project specifications and drawings
- Develop BMS architecture and network topology
- Prepare control strategies and sequence of operation
- Selection of controllers, sensors, actuators, and panels
- Preparation of shop drawings and I/O lists
2. Supply & Installation
- Supply of BMS controllers (DDC / PLC)
- Supply and installation of field devices:
- Temperature, humidity, pressure sensors
- Valves, dampers, actuators
- Flow meters and energy meters
- Installation of BMS panels and control cabinets
- Cable containment, wiring, and labeling
- Power supply and earthing
3. Field Integration & Interfaces
- Integration with HVAC systems:
- AHUs
- Chillers
- Chilled water pumps
- VAVs
- Boilers
- Integration via BACnet, Modbus, or other open protocols
4. Programming & Configuration
- Development of controller logic
- Alarm configuration and thresholds
- Trend setup and data logging
- Time schedules and set points
- User access levels and permissions
5. Graphics & HMI
- Development of graphical user interface
- Floor plans and system schematics
- Real-time monitoring dashboards
- Alarm and trend visualization
- Web-based and workstation HMI
6. Testing, Commissioning & Validation
- Point-to-point testing
- Functional performance testing
- Alarm and fail-safe testing
- Integration testing with third-party systems
- Site Acceptance Test (SAT)
- Factory Acceptance Test (FAT) (if required)
7. Documentation & Handover
- Operation & Maintenance manuals & Data sheets
- Software backup
- System security & authorization, Passwords and licenses handover
- Schematic Diagram (P&ID).
- As-built Control wiring diagram.
- Data Point of PLC program
- Vendor list /Bill of Material.
- Sequence of operation.
- Standard Operator Procedures (S.O.P).
- Validation Qualification documents IQ- OQ
- Batch data reports
- Audit trail and its report
- Historical alarm, diagnostics of alarms and alarm reports
- System integrity and backup, Data archiving, retrieving
- Software / Computer system validation
8. Training
- Operator training
- Engineering and maintenance training
- System administration training
9. Warranty & Maintenance Support
- Warranty period support
- Preventive maintenance
- Remote support (if applicable)
- Spare parts and upgrade support
10. Compliance & Standards
- Compliance with project specifications
- Compliance with:
- ASHRAE
- IEC standards
- Local authority requirements
- FDA 21 CFR part 11
- cGAMP5
Cybersecurity best practices